My project in Los Angeles continues, and it will be a week or two until all the planning is done. I’ll be in contact with you in to place my order, but before that, I have a question on electrical wiring of a PBS SIP when the floor and wall are both panels. With an open floor system electrical systems are easier to work with, but I would like to enclose the entire building envelope with SIPs (floor/wall/roof). The project will be over a crawl space. Using one of the PBS details drawing, I have added a proposed diagonal hole in the floor panel to pass up electrical wiring. Is this an acceptable practice, or is there a better way to work with the electrical system and panel system?